Specification Quotation Form
EQUIPMENT
(required)
QUANTITY

PUBLISHED TECHNICAL REFERENCE

The "Induced Vertical Flow" of Bins and Silos.
STORED BULK SOLID
(required)
 
Classification
General Floodable Flake
Degree of "Set"
Mild Strong Severe
 
Density
PCF
 
Temperature
Ambient ¼F
Moisture Content
% Corrosive? Yes No
Particle Size Range
Pressure
Atmospheric
TIME STORED DORMANT
UPPER BIN OR
STORAGE PILE
 
 
Diameter
Vertical Wall Height
Cone Section Slope
Degrees
Wall Material
Thk.
Filling Method
DISCHARGE RATE
TPH (max) (IF APPLICABLE)
DISCHARGES INTO:
(IF APPLICABLE)
Gate @ outlet
No Yes
Name:
(required)
 
Title:
Company:
(required)
Phone:
(required)
 
FAX:
 
Comments: